Chevron Energy Solutions and ADI Energy developed a comprehensive wind project plan for the State of Rhode Island and Town of Narragansett. The plan evaluated five locations, determining maximum the wind resources and the appropriate wind turbine generator for each site.
Alternative energy
Site evaluation
System evaluation and design
Resource assessment
Consumption usage analysis
Energy analysis
Preliminary assessment for energy
Wind power assessment modeling
Cost and economic analysis
Environmental and regulatory analysis
Renewable energy services
Energy reduction
Energy financial analysis
Wind turbine generator
Chevron Energy Solutions and ADI Energy evaluated the five potential sites selected by the State and Town. Based on the findings, Chevron Energy Solutions and ADI Energy determined that all of the five sites were good candidates for wind turbines.

Chevron and ADI Energy evaluated the wind resource and selected the appropriate wind turbines to achieve the State and Town goals of production and revenue maximization.

  • ENERGY CONSERVATION RHODE ISLAND
  • ENERGY CONSULTING RHODE ISLAND
  • ENERGY EFFICIENCY RHODE ISLAND
  • WIND ENERGY RHODE ISLAND